Tree survey information your project can actually use
If you already have an older tree survey for Bletchingley, send it. Existing data is useful context and may still be suitable, depending on its age, the current condition of the site and how much the project has changed.
Reliable categories, crown information and RPAs create the evidence base for the later design assessment. If the authority has already raised a tree question, send it with the plan so the survey/report sequence can be targeted.
We would rather review what you already have than assume the answer is automatically a complete repeat survey.
What should you send before the survey is booked?
Start with the Bletchingley site address, the latest architectural or site plan and the exact wording from Tandridge, your architect or planning consultant. If a topographical survey exists, include it. If somebody has already prepared a tree report, send that too.
Those documents let us understand the stage of the project before we quote. A client who is still testing feasibility may only need the baseline survey and constraints information. A client with a completed planning layout may need the survey data to move directly into an AIA. A post-permission project may not need a fresh survey at all if the approved information remains suitable.
The aim is to commission the next useful piece of work, not the longest possible package.




