Tree survey information your project can actually use
The most useful survey is the one the rest of the project can keep using. Tree references should stay consistent from the schedule and constraints plan through to the AIA, TPP and any site-supervision records.
The survey becomes much more useful when the tree references can be coordinated with the live topo and architectural base. If Guildford has already asked for specific tree information, send that wording too so the scope answers the current planning question rather than a generic one.
That continuity makes the planning package easier for the design team to manage and easier for Guildford to follow.
What should you send before the survey is booked?
Start with the Burpham site address, the latest architectural or site plan and the exact wording from Guildford, your architect or planning consultant. If a topographical survey exists, include it. If somebody has already prepared a tree report, send that too.
Those documents let us understand the stage of the project before we quote. A client who is still testing feasibility may only need the baseline survey and constraints information. A client with a completed planning layout may need the survey data to move directly into an AIA. A post-permission project may not need a fresh survey at all if the approved information remains suitable.
The aim is to commission the next useful piece of work, not the longest possible package.




