Tree survey information your project can actually use
Neighbouring trees are often overlooked at the start of a project. If a crown or rooting area can influence the proposed development, that tree can still matter even though it is outside your ownership.
Send the current layout and authority wording together. The survey can then be scoped around the site and the trees that can realistically affect design, access, construction or future use.
The survey extent for Kingswood is therefore based on what can affect the project, not simply on the legal boundary line.
What should you send before the survey is booked?
Start with the Kingswood site address, the latest architectural or site plan and the exact wording from Reigate and Banstead, your architect or planning consultant. If a topographical survey exists, include it. If somebody has already prepared a tree report, send that too.
Those documents let us understand the stage of the project before we quote. A client who is still testing feasibility may only need the baseline survey and constraints information. A client with a completed planning layout may need the survey data to move directly into an AIA. A post-permission project may not need a fresh survey at all if the approved information remains suitable.
The aim is to commission the next useful piece of work, not the longest possible package.




