Tree survey information your project can actually use
The most useful survey is the one the rest of the project can keep using. Tree references should stay consistent from the schedule and constraints plan through to the AIA, TPP and any site-supervision records.
Send the current layout and authority wording together. The survey can then be scoped around the site and the trees that can realistically affect design, access, construction or future use.
That continuity makes the planning package easier for the design team to manage and easier for Reigate and Banstead to follow.
What should you send before the survey is booked?
Start with the Lower Kingswood site address, the latest architectural or site plan and the exact wording from Reigate and Banstead, your architect or planning consultant. If a topographical survey exists, include it. If somebody has already prepared a tree report, send that too.
Those documents let us understand the stage of the project before we quote. A client who is still testing feasibility may only need the baseline survey and constraints information. A client with a completed planning layout may need the survey data to move directly into an AIA. A post-permission project may not need a fresh survey at all if the approved information remains suitable.
The aim is to commission the next useful piece of work, not the longest possible package.