Tree survey information your project can actually use
Neighbouring trees are often overlooked at the start of a project. If a crown or rooting area can influence the proposed development, that tree can still matter even though it is outside your ownership.
If a previous survey exists, send it first. We can check whether it is still usable before assuming a complete resurvey is needed, and then identify the next planning document from the live project stage.
The survey extent for Mayford is therefore based on what can affect the project, not simply on the legal boundary line.
What should you send before the survey is booked?
Start with the Mayford site address, the latest architectural or site plan and the exact wording from Woking, your architect or planning consultant. If a topographical survey exists, include it. If somebody has already prepared a tree report, send that too.
Those documents let us understand the stage of the project before we quote. A client who is still testing feasibility may only need the baseline survey and constraints information. A client with a completed planning layout may need the survey data to move directly into an AIA. A post-permission project may not need a fresh survey at all if the approved information remains suitable.
The aim is to commission the next useful piece of work, not the longest possible package.



