Tree survey information your project can actually use
A BS5837 survey for New Haw should do more than put tree numbers on a plan. It should give the design team a dependable picture of tree quality, crown spread and rooting constraints so the proposal can be developed with the real site in mind.
Send the live plan, topo if available and the council wording. We can establish what needs surveying now and whether the next useful deliverable is a constraints plan, AIA or construction-stage document.
Where the design is still flexible, that information is most valuable early. Where the design is already fixed, the same survey becomes the evidence base for testing impacts and explaining the proposal to Runnymede.
What should you send before the survey is booked?
Start with the New Haw site address, the latest architectural or site plan and the exact wording from Runnymede, your architect or planning consultant. If a topographical survey exists, include it. If somebody has already prepared a tree report, send that too.
Those documents let us understand the stage of the project before we quote. A client who is still testing feasibility may only need the baseline survey and constraints information. A client with a completed planning layout may need the survey data to move directly into an AIA. A post-permission project may not need a fresh survey at all if the approved information remains suitable.
The aim is to commission the next useful piece of work, not the longest possible package.




