Tree survey information your project can actually use
Trees can influence more than the location of a new building. Driveways, parking, drainage, services, changes in level, demolition and working space can all affect the arboricultural position.
Send the live plan, topo if available and the council wording. We can establish what needs surveying now and whether the next useful deliverable is a constraints plan, AIA or construction-stage document.
A well-scoped Longcross survey creates the base information needed to consider those relationships properly rather than discovering them one at a time later in the design.
What should you send before the survey is booked?
Start with the Longcross site address, the latest architectural or site plan and the exact wording from Runnymede, your architect or planning consultant. If a topographical survey exists, include it. If somebody has already prepared a tree report, send that too.
Those documents let us understand the stage of the project before we quote. A client who is still testing feasibility may only need the baseline survey and constraints information. A client with a completed planning layout may need the survey data to move directly into an AIA. A post-permission project may not need a fresh survey at all if the approved information remains suitable.
The aim is to commission the next useful piece of work, not the longest possible package.




