Arboricultural Method Statement for Surrey projects
An Arboricultural Method Statement moves the project from “this can be built” to “this is how it will be built without avoidable tree damage”. It is commonly required by planning condition where excavation, access, surfacing, drainage, services or other construction activity comes close to retained trees.
The document should be practical enough for a contractor to follow. It can define fencing, site set-up, no-dig construction, hand excavation, root-sensitive working, service installation, sequencing, supervision and the actions to take if unexpected roots or site conditions are encountered.
If permission has already been granted, send the decision notice, approved drawings and the exact condition wording. That lets the method statement respond to what has actually been approved rather than reproducing generic BS5837 guidance.
What you receive
The exact output is matched to the project, but the core deliverables normally include the items below. If the council has supplied its own wording, that request is reviewed first so the proposal is built around the live requirement.
- Site-specific construction methodology
- Protection and exclusion requirements
- Sequence for sensitive works
- Guidance for excavation, surfacing and services
- Supervision or inspection hold points
- Cross-reference to the Tree Protection Plan

