BS5837 Tree Report for Surrey projects
A tree report for planning turns raw survey information into a document the project team and Local Planning Authority can actually use. It explains what was surveyed, which trees matter to the proposal, how the information should influence design and which additional plans or assessments are needed for the current planning stage.
The right level of reporting depends on the project. A straightforward domestic extension may need concise, focused evidence. A replacement dwelling, infill scheme or larger development can require a fuller explanation of retention, removal, Root Protection Areas, access, surfacing, drainage and construction constraints. The report should answer the planning question without burying it in unnecessary material.
If you have already been told that a “tree report” is required, send the exact wording with the latest drawings. We can check whether the request is for the survey/report stage or whether the authority is really asking for an AIA, AMS, TPP or another specific document.
What you receive
The exact output is matched to the project, but the core deliverables normally include the items below. If the council has supplied its own wording, that request is reviewed first so the proposal is built around the live requirement.
- Planning-focused written arboricultural report
- Survey findings and tree schedule presented clearly
- Explanation of tree constraints relevant to the proposal
- Coordination with current drawings
- Recommendations for the next BS5837 stage
- Digital report ready for the project team to circulate

